Hotel Environment
Executive Summary
1.1
Project Krabi
Emerald Resort, 66
units
1.2 Location
Moo 3 Soi
Klong Hang,
Tambon Ao-nang, Amphur Muang, Krabi Province
1.3
Project owner
Afarica-Dreaming Co.,Lt.d
1.4
Consultant Ms Phenpara
Sibisiri
1.5
Report submission
April 9, 2003
IEE report was
approved in meeting on May 15,2003. Project owner has improved
project
layout in appendix of IEE report.
(8)
Conceptual Design
§
In each
room can see natural view in project area with area for sun-bath and view
seeing. Building structure is designed to look as general house with soft
color tone and low level of ceramic roof.
§
Building height about 3.28-10.70 meters, which not higher than big tree
level in project.
§
Merging
way of each building must be complied with regulation. This merging way will
increase more usable area.
§
Green
area will use local plant species that tolerance to Krabi weather, these
plants such as coconut, plam, banyan tree,
§
ส่วนพื้นที่สีเขียวของโครงการจะเน้นการใช้พันธุ์ไม้พื้นเมืองที่ทนต่อสภาพอากาศของ
จังหวัดกระบี่ เช่น ต้นมะพร้าว ต้นปาล์ม หมากแดง ไทร หมากผู้-หมากเมีย
ต้นไม้ดอกและ
ไม้พุ่ม เช่น ราชินีหินอ่อน เบิร์ดออฟพาราไดส์ ซองออฟอินเดีย สายหยุด เล็บครุฑ
กะพ้อ
เหงือกปลาช่อน ส่วนไม้เลื้อยจะเน้นที่มีกลิ่นหอม มีสีสันและให้ร่มเงา เช่น
ต้นการะเวก ต้นเฟื่องฟ้า เป็นต้น และต้นไม้ประดับอื่นๆ อีกหลายชนิด
Environment / Local Resource Palm
and Coconut tree
(4)
Source
of art and natural environment Aou
Nang Seaside,
Hat
Noparattara natural park and PP islands
(5) Laws
and Regulations
(1) Notification
of ministry of science, technology and environment; environmental
conservative area in Krabi province B.E.2540
(2)
Building Control Act B.E. 2522
1.6
Project progress
(Φ)
Permission to construction in 1999 for 9 buildings and in 2000 for 13
buildings
(totally 6 permit licenses).
( ) Permission to extent construction
...
(Φ)
Finished construction 100% at the end of 2000, but project owner has to
modify buildings to comply with Building Act. This has been shown in
additional information 2 for using these building as hotel purpose after
acquired permit from local authority.
1.7
Existing status during August October 2003:
closing for improvement.
1.11
Public utility in project area
(1)
Water system
Total waster use 53.3
cu.m. /day
(attachment with calculation and plan in report Aril 2003)
Calculation from average
value 750 litre/room/day and number of guest 2 persons/room
Reference ;
guideline for environmental impact assessment (minimum) for project of
housing, public service and hotel ; Office of Environmental Planning
and Policy B.E.2540
Source of water
(show
detail in case of more than one source of water) Present, source of water
come from underground water 63 meters deep , permit license no.
2-50943-0005. In the near future, project will use water from Water Local
Authority.
Water treatment system
; Sand and carbon
filter 1 set and increase 1 set in future
Spare water source
; buy
water from private sector
(2)
Wastewater treatment
Total wastewater 42.64 cu.m./day
Calculation from average value 80 % of
water usage
Reference ;
guideline for environmental impact assessment (minimum) for project of
housing, public service and hotel ; Office of Environmental Planing and
Policy B.E.2540
Wastewater
treatment system ( ) Central wastewater treatment (Φ)
On-site for each building
Type of
wastewater treatment system Septic
Tank
Wastewater treatment diagram (attachment in page 2-75 of report
April 2003)
Wastewater treatment layout
(attachment in
appendix 7 of report April 2003)
Central
treatment plant for Krabi province ( ) Yes (Φ)
No
Remark : Assessment of wastewater
treatment for extension project; good efficiency, no wastewater discharge. Project
owner has committed that no wastewater discharge to public water source and
conserve surrounding area. Project owner has selected the septic treatment
system with suitable for this sandy ground area. This sandy ground type is
most functional for wastewater treatment and let no water discharge to
outside. Microorganisms in 3 meters dept with aerobic process will treat
wastewater and treated water will be filtered by sand. (reference; Pichit
Sakulprama, environmental sanitary, public health faculty, Mahidol
university B.E. 2535)
(3)
Water
discharge system
Water discharge
system (Φ)
Separated rain and wastewater system ( ) Combine system
Effluent water
(
) To wastewater drainage
( ) Recycle
( ) Discharge to public water source
Utilization of water
BOD of water source
mg/litre BOD mix
.
( ) Keep in project reservoir
.
(Φ
) Zero discharge, treated water penetrating to ground
( ) Other
Storm water in project
area
Natural drainage and some part discharge to public water source (Klong
Hang), south of project
Storage of
storm water before discharge to outside
-
.
Plan layout
of storm storage area or discharge to outside, in page
-
..
Permit license for water discharge; in appendix 2 of report April
2003
(4)
Solid
waste collection and disposal
Local authority
Tambol
Aou Nang
Total solid waste 0.97
cu.m./day
Average solid waste 3.1
kg/room/day , Density 0.21 kg/litre
Reference ;
guideline for environmental impact assessment (minimum) for project of
housing, public service and hotel ; Office of Environmental Planing and
Policy B.E.2540
Solid waste collection ; house keeper collect daily from
guest room, segregate recycle waste and keep in storage room.
Storage room size
1*2*1.5
cu.m.
Location
Car park near Soi Klong Hang (not starting to construction)
Solid waste storage
layout (show in figure 1-3
in this report)
Collection permit license
from Tambol Aou
Nang (in appendix
2 in report April 2003)
(5)
Traffic
system
In and Out sytem ; only 1walkway to Soi
Klong Hang. In future , one new walkway will occur, which merging to new 6
meters wide road of Tambol Aou Nang local authority.
In project traffic system
; there have only walkway system, but in future road will be constructed
with car park located in western of project area.
ค่า V/C RATIO ;Soi Klong Hang at present V/C RATIO = 0.0084 and V/C RATIO = 0.012 when
full operation service
Car park in present
1 park
; number of car
-.. Number of motorcycle
15
Car park in future
2
parks;
(1) Leasing
area around project for 20
cars
(2) Open
car park in western part of project area for 13 cars
Car
park in (1) can be constructed after permission. Car park (2) has to wait
for new road merging from outside of project.
Traffic system in project area shown in figure
1-3 in this report.
Road merging / Bridge
construction permission ; Bridge
will be constructed to merge new road in southern part of project.
(6)
Electricity system
Transformer 150
KVA
1 set
Source of electricity;
Krabi
electricity authority
(7)
Ventilation
Air ventilation
Separation system Location
in each room
Ventilation in
kitchen Air
exhaust system
Steam sytem
separation system
(8)
Fire
prevention
Type of
building (Φ
) 1 floor (Φ
) 2 floors (Φ
) 3 floors ( ) 4 floors ( )
floors
Water
source ( ) Storage tank (Φ
) water use tank (Φ)
swimming pool and groundwater
Water spare in water
reservoir for fire fighting
10
cu.m.
Fire equipment
74
tanks location
next each rooms - lobby - restaurant - chitchen
One
hydrant
is
installed
in front of project area.
Chemical extinguisher
1set /
floor located near stair
Fire detector
1set/floor
Smoke / heat detector
will be installed in very rooms.
Law /regulation
enactment no.39 of Building Control Act
Fire service station
located at Tambol Aou Nang authority, 1000 meter distance
Other ; Sign to
identified fire extinguisher , shown at door in each room and building
walkway.
(1.12)
Summary of project construction
Project has
finished construction since 2000. Extension project is only to modification
to comply permit license.
In this
step will take not more than 2 months. Impact will be occurred in low level
because mostly is woodwork and less than 10 workers without overnight
staying in project area.
1.8
Project Detail
(1)
Project size, 9-1-72 Rai (15,088 square
meters) in 5 total permit licenses (attachment of Project plan layout and
land deeds)
(2) Total
room 66
rooms
(3)
Components of project and size
Present project has 17 buildings (according to new modified buildings that
will be submitted for permit);
-
Two
floors, 13 buildings
-
Three
floors, 2 buildings
-
Store-room 2 buildings
Total area of 17 buildings are 2,984.77
square meters
(please see table 1-1). Detail in each building are, (figure 1-2, 1-3 show
new modified project plan and sanitary layout. All of project plan shows in
appendix 2)
q
Guest room building : 15
buildings
-
Building
F1 for guest room ( 3
floors 1 buildings ,
total 6
rooms)
Usable
area = 307.8
square meters
Cover
area = 120
square meters
-
Building
F2 for guest room ( 2
floors
2
buildings, total 4 rooms)
Usable
area = 133
square meters
Cover
area = 107
square meters
-
Building
F2-A for guest room ( 2
floors
1 building,
total
2
rooms)
Usable
area = 93.92
square meters
Cover
area = 69
square meters
-
Building
F2-B for guest room (2
floors
1 buildings,
total 6
rooms)
Usable
area = 267.75
square meters
Cover
area = 195.3
square meters
-
Building
F2-C for guest room ( 2
floors 1 building, total
4
rooms)
Usable
area = 221.5
square
meters
Cover
area =
141
square meters
-
Building
F2-D for guest room ( 2
floors
1
building, total
2
rooms)
Usable area
= 75.25
square meters
Cover
area =
53.5
square meters
-
Building
F2-E for guest room and
various purposes, merging with walkway
and arch of
tree( 3
floors 1 building, total
2 rooms)
Usable
area =
298
square meters
Cover
area =
152
square meters
-
Building
F3
for guest room ( 2
floors 2
buildings, total 6 rooms)
Usable
area = 275.5
square meters
Cover
area = 200.8
square meters
-
Building
F3-A for guest room ( 2
floors 1 building, total
8 rooms)
Usable
area =
295.95
square meters
Cover
area =
183.25
square meters
-
Building
F3-B for guest room
( 2
floors
1 building,
total 8 rooms)
Usable
area = 296.28 square meters
Cover
area =
183.25
square meters
-
Building
F4 for guest room ( 2
floors
1 building,
total 4
rooms)
Usable
area = 149.16 square meters
Cover
area = 93
square meters
-
Building
F4-A for guest room ( 2
floors
1 building,
total 12
rooms)
Usable
area = 448.08 square meters
Cover
area = 290.25
square meters
-
Building
F5 for guest room (
2 floors
1
building, total
2
rooms)
Usable
area = 74.58 square meters
Cover
area = 58.5
square meters
q
Service building ;
2 buildings
-
Store-room ( 1
floor 2 buildings)
Usable
area = 48
square meters
Cover
area = 96
square meters
(Already construction,
in process for permit license)
q
Other components
-
2
swimming pools
-
Green
area and free area 87% of total project area
-
Open
area for massage service
Remark
-
Buildings have been
submitted for permit license
1.
Store-room 2 buildings (already construction)
Table 1-1
Area use in building
|
Usable area |
Number of room |
Area (square meter) |
|
q
Building F1 (3 floors; 9.6 meters) |
|
|
|
- Floor 1 for guest room |
3 |
112.5 |
|
- Floor 2-3 for Duplex room |
3 |
195.3 |
|
Total building in F1 |
1x6 =6 |
307.8 |
|
q
Building F2 (2 floors; 6.6 meters) |
|
|
|
- Floor 1 for guest room |
1 |
37.5 |
|
- Floor 2 for guest room |
1 |
29 |
|
Total 2 buildings in F2 |
2x2 =4 |
2
x
66.5=133 |
|
q
Building F2-A
(2 floors; 6.6 meters) |
|
|
|
- Floor 1 for guest room |
1 |
64.92 |
|
- Floor 2 for guest room |
1 |
29 |
|
Total 1 building in F2-A |
1x2 =2 |
93.92 |
|
q
BuildingF2-B (2 floors; 7.65 meters) |
|
|
|
- Floor 1 for guest room |
3 |
155 |
|
- Floor 2 for guest room |
3 |
112.75 |
|
Total 1 building in F2-B |
1x6 = 6 |
267.75 |
|
|
|
|
|
q
Building F2-C (2 floors; 6.6 meters) |
|
|
|
- Floor 1 for guest room |
2 |
130 |
|
- Floor 2 for guest room |
2 |
91.5 |
|
Total 1 building in F2-C |
1x4 = 4 |
221.5 |
|
q
Building F2-D (2 floors;6.6 meters) |
|
|
|
- Floor 1 for guest room |
1 |
37.75 |
|
- Floor 2 for guest room |
1 |
37.75 |
|
Total 1 building in F2-D |
1x2 = 2 |
75.25 |
|
q
BuildingF2-E (3 floors; 10.4 meters) |
|
|
|
-
Floor 1 for guest room, waiting room and kitchen |
1 |
135.75 |
|
- Floor 2 for guest room and reception |
1 |
120.25 |
|
- Floor 3 hall |
|
42 |
|
Total 1building in F2-E |
1x2= 2 |
298 |
|
q
Building F3
(2 floors;
6.60
meters) |
|
|
|
- Floor 1 for guest room |
2 |
75 |
|
- Floor 2 for guest room |
1 |
62.75 |
|
Total 2 building in F3 |
2x3
= 6 |
2
x 137.75=275.5 |
|
q
Building F3-A (2 floor; 7.65 meters) |
|
|
|
- Floor 1 for guest room |
4 |
183.75 |
|
- Floor 2 for guest room |
4 |
112.2 |
|
Total 1 building in F3-A |
1
x8 = 8 |
295.95 |
|
q
Building F3-B(2 floors; 7.65 meters) |
|
|
|
- Floor 1 for guest room |
4 |
162 |
|
- Floor 2 for guest room |
4 |
134.28 |
|
Total 1 building in F3-B |
1
x8 =8 |
296.28 |
|
q
Building F4 (2 floors; 7.65 meters) |
|
|
|
- Floor 1 for guest room |
2 |
82.5 |
|
- Floor 2 for guest room |
2 |
66.66 |
|
Total 1 building in F4 |
1
x4 = 4 |
149.16 |
|
q
Building F4-A(2 floors; 7.65 meters) |
|
|
|
- Floor 1 for guest room |
6 |
238.5 |
|
- Floor 2 for guest room |
6 |
209.58 |
|
Total 1 building in F4-A |
1
x12 =12 |
448.08 |
|
q
Building F5 (2 floors; 7.65 meters) |
|
|
|
- Floor 1 for guest room |
1 |
41.25 |
|
- Floor 2 for guest room |
1 |
33.33 |
|
Total 1 building in F5 |
1
x2 = 2 |
74.58 |
|
q
Store-room (1floor;3.28
meters) |
|
|
|
- Floor 1 store-room |
- |
24 |
|
Total
2
building in store area |
- |
2
x
24=48 |
|
Total area in all buildings |
66 |
2,984.77 |
(4)
Building area
2,984.77 square meters
Cover
area 1,942.85 square meters
(FAR = 0.2 : 1)
Free
area 13,145.15 square meter
(OSR = 87%.)
(5)
Building Type ; house with 2 and 3 floors , brick-concrete wall,
yellow-orange color shade, steel structure roof and gold-orange shade of
cpac monier ceramic roof (side view and cut view
of building in appendix 2 of additional information report 2)
Total 17
buildings (according to modified buildings)
Height 3.28 -
10.40
meters
Guest room building 2
floors height 6.6 - 7.65
meters
Guest room building 3
floors height 9.6 - 10.40
meters
Store-room
building
height
3.28 meters
(6) Number
of employee
50
persons (stay in project
...persons)
(7) Number
of guest 2/4
persons/room
1.10
Geographic of project
(1) Land
use of surrounding project ; mostly hotel, bungalow
and plaza, local communities located far from main road. Project has
boundaries following,
Northern
close to free area
and BlueVillage
Southern
close to
palm garden,
public klong(klong
Hang)
and Pavillian hotel (5 floors)
Eastern
close to
public road and
palm garden
Western
close to
free area
(Figure in page 2-6 of
report April 2003)
(2) Former
land use in project area leasing house
Existing
(figure of project existing in page 3-2of report April 2003)
(3)
(6)
City
Plan Control volume
< |